LOCATION: Trenton, SC
PROJECT SIZE:423,000 SF
DETAILS:The first Generac generator production facility located in the southeast with a fully conditioned 423,000 SF building - 400,000 SF of manufacturing and 23,000 SF of office. Utility infrastructure upgrades of the primary electrical service, transformer and switchgear; natural gas service; fire water service and domestic water service. Installed utilities for production lines, paint line and assembly lines. Wastewater treatment system, dust collection and exhaust stacks for heat and sumes. Process loops for compressed air, natural gas, RO water, oil and chiller water. Entire building and proccesses backed up by 2,500-kw (five 500-kw gensets).
SERVICE:Cohn Construction Services
Manufacturing Projects